Meru · Change Orders

Know exactly what changed, before you approve

Meru reads every design change and writes a plain-English summary with the visual differences highlighted directly on the part - so engineering, quality, and manufacturing can review and approve ECOs in minutes, not days.

Most change orders get approved on faith, not visibility

When a part changes, reviewers are left to compare drawings by eye, decode a one-line ECO description, or just trust that engineering got it right.

Manufacturing finds out the tolerance moved after the tooling's already cut. Quality re-qualifies parts they didn't know were touched. Approvals slow down, or worse, something slips through.

Three ways Meru makes change orders reviewable

Meru reads every revision the way a senior engineer would: comparing geometry, dimensions, and metadata to tell you exactly what changed, why it matters, and who it affects.

Auto-Annotated Change Descriptions

Meru compares revisions automatically and writes a plain-English summary of every dimensional, geometric, and material change. No more one-line ECO descriptions that leave reviewers guessing.

----------------------
70% faster change-order write-up

Highlighted Visual Differences

Every change order includes the model and drawing with additions, removals, and modifications color-coded directly on the geometry, so reviewers see exactly what moved at a glance, not just what a description claims moved.

----------------------
100% of changes visually flagged

Impact & Where-Used Visibility

Meru surfaces every assembly, BOM, and open ECO tied to the changed part, so reviewers understand downstream impact before they sign off - not after.

‍

----------------------
0 downstream surprises

From redline to approval, without the detective work

Meru plugs into your existing change process. Review from the ECO itself - every change order arrives with the summary and visuals already attached.

See what changed, in plain English

Meru reads the geometry, dimensions, and metadata between revisions and writes the change description for you.

Visual diff, overlaid on the part

Old and new revisions are overlaid directly on the model or drawing, with additions, removals, and modifications color-coded so reviewers can see the change instead of hunting for it.

Know who's affected before you sign off

Meru shows every assembly, BOM, and open ECO tied to the changed part, so reviewers can catch downstream impact before approval, not after.

Built for every team that touches a change order

Engineers

Spend less time writing redlines and defending changes, more time designing.

----------------------
85% less time per ECO write-up

Reviewers & Quality

Approve with confidence - see the actual change, not just a description of it.

----------------------
60% faster ECO reviews

Leadership

Fewer changes slip through unreviewed. A full audit trail, every time.

----------------------
95% fewer post-release quality escapes

Every change, understood. Every approval, confident.
‍

Join the engineering teams reclaiming their time - and the certainty that comes with every approval.